Skip to content

Latest commit

 

History

History
37 lines (27 loc) · 2.35 KB

File metadata and controls

37 lines (27 loc) · 2.35 KB

Planning Documentation

Planning profile

  • Strategy: contract-first
  • Depth: standard
  • Mode: strict
  • Last updated: 2026-02-25

Stage-to-artifact mapping

Stage Artifact File
0 - Intake gate Intake notes + assumptions Product Brief
1 - Scope and constraints Scope, constraints, non-goals Product Brief
2 - Outcomes and metrics Business and user outcomes, success/failure metrics Product Brief
3 - Problem framing Current state, pain, hypotheses Product Brief
4 - Solution options and tradeoffs Alternatives and recommendation Design Doc
5 - Requirements and acceptance FR, NFR, AC, flows, instrumentation PRD
6 - Architecture decisions Irreversible decisions ADR Index
7 - Technical design synthesis Coherent architecture + contracts + C4 Design Doc
8 - Delivery planning Product-level sequencing, rollout, rollback Delivery Plan

Product branch

  • Product Brief - stage 0-3 discovery baseline
  • PRD - stage 5 requirements contract
  • Design Doc - stage 4 and 7 synthesis, C4 diagrams, domain model, contracts
  • ADR Index - stage 6 decisions

Process branch

Supporting technical references

All technical references (security, deployment, data flows) are consolidated in Design Doc.