Skip to content

Validated type-hint changes #2500

Validated type-hint changes

Validated type-hint changes #2500

Triggered via push December 25, 2025 07:54
Status Failure
Total duration 59s
Artifacts

run-pytest.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 2 warnings
build (3.10)
Process completed with exit code 1.
build (3.12)
The strategy configuration was canceled because "build._3_10" failed
build (3.12)
The operation was canceled.
build (3.10)
Failed to restore: Cache service responded with 400
build (3.12)
Failed to restore: Cache service responded with 400