Skip to content

build(deps): bump pnpm/action-setup from 5 to 6 #205

build(deps): bump pnpm/action-setup from 5 to 6

build(deps): bump pnpm/action-setup from 5 to 6 #205

Triggered via pull request April 13, 2026 14:39
Status Failure
Total duration 1m 7s
Artifacts

pull_request.yml

on: pull_request
Matrix: test-unix
Matrix: test-win
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test-unix (latest)
Process completed with exit code 1.
test-unix (lts/*)
The strategy configuration was canceled because "test-unix.latest" failed
test-unix (lts/*)
Process completed with exit code 1.
test-win (latest)
Process completed with exit code 1.
test-win (lts/*)
The strategy configuration was canceled because "test-win.latest" failed
test-win (lts/*)
The operation was canceled.