Project Status

This document tracks the implementation progress, test coverage, and outstanding issues for each major component of the IOLinke-Device Workspace.

Legend

  • ✅ Complete: Fully implemented and tested

  • 🟡 Partial: Partially implemented or tested

  • ⬜ Pending: Work not yet started

  • ❌ NA: Not Applicable

Component Status

Table 1. Implementation and Testing Status
Component Implementation Host Testing Target Testing

IOLinke-types

✅ Complete

❌ NA

❌ NA

IOLinke-DEVICE

✅ Complete

🟡 Partial

⬜ Pending

IOLinke-Bindings

✅ Complete

⬜ Pending

⬜ Pending

IOLinke-Dev-config

✅ Complete

❌ NA

❌ NA

IOLinke-Derived-config

✅ Complete

❌ NA

❌ NA

IOLinke-Test-utils

✅ Complete

❌ NA

❌ NA

IOLinke-Examples

✅ Complete

❌ NA

❌ NA

IOLinke-macros

✅ Complete

❌ NA

❌ NA

IOLinke-util

✅ Complete

❌ NA

❌ NA

Detailed Testing Status

ISDU Module Testing

Table 2. ISDU Transfer Testing Summary
ISDU Test Case Host Testing Target Testing

Operations

Pre-Operate

Operate

Pre-Operate

Operate

Read

Write

Read

Write

Read

Write

Read

Write

Standard Length Transfer

✅ Pass

✅ Pass

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

⬜ Pending

⬜ Pending

Extended Length Transfer

✅ Pass

✅ Pass

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

⬜ Pending

⬜ Pending

ISDU Busy Handling

✅ Pass

✅ Pass

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

⬜ Pending

⬜ Pending

No Service Response

✅ Pass

✅ Pass

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

⬜ Pending

⬜ Pending

On-Request Data (OD) Testing

Table 3. OD Module Testing Summary
Data Length Host Testing Target Testing

(bytes)

Read

Write

Read

Write

1

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

2

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

32

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

Process Data Testing

Table 4. PD Input Testing Summary
Data Length Host Testing Target Testing

(bytes)

Read

Write

Read

Write

3 (Octet)

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

Table 5. PD Output Testing Summary
Data Length Host Testing Target Testing

(bytes)

Read

Write

Read

Write

4 (Octet)

✅ Pass

✅ Pass

⬜ Pending

⬜ Pending

Recent Updates

  • Implementation Phase Complete: All core components have been implemented and are feature-complete

  • Host Testing In Progress: ISDU, OD, and PD modules have passed initial host-based testing

  • Target Testing Pending: Hardware validation on actual IO-Link devices is scheduled

Outstanding Issues

  • Target hardware testing not yet initiated - requires physical IO-Link master and test setup

  • IOLinke-Bindings require validation with C-based firmware integration

  • Extended testing scenarios for edge cases and error conditions pending

  • The current host testing architecture is unstable and may yield inconsistent results across runs.

Next Steps

Immediate Priorities

  1. Target Hardware Testing

    • Set up physical test environment with IO-Link master

    • Validate ISDU transfers on actual hardware

    • Test PD and OD operations in real-world scenarios

  2. Bindings Validation

    • Complete C binding integration tests

    • Validate FFI interface with sample C applications

  3. Extended Testing

    • Add stress testing scenarios

    • Validate timing requirements per IO-Link v1.1.4 specification

    • Test interoperability with multiple IO-Link master implementations

Future Enhancements

  • Establish a robust, configurable host testing framework to ensure consistent, repeatable test execution across diverse configurations and environments

  • Implement diagnostic and monitoring features

  • Create comprehensive integration test suite

  • Develop automated hardware-in-the-loop (HIL) testing framework