Tracking the 13 minor items deferred during Sprint 4.x cluster reviews. Each was flagged Minor by either the per-task two-stage reviewer or the cluster-level reviewer (opus). None are bounty-blocking; SHIP IT verdict held across all four sprint reviews. All P3 (cosmetic / test-quality / pre-existing).
Single P3 cleanup PR post-bounty (after 2026-05-12). Could be batched into a quarterly tech-debt sprint or split into product-code (3 items) + test-quality (9 items) + process (1 item) sub-clusters if the volume justifies it.
Tracking the 13 minor items deferred during Sprint 4.x cluster reviews. Each was flagged Minor by either the per-task two-stage reviewer or the cluster-level reviewer (opus). None are bounty-blocking; SHIP IT verdict held across all four sprint reviews. All P3 (cosmetic / test-quality / pre-existing).
Items
Sprint 4.3 (PR #41) — P1 cluster
DEV_TOKENinline comment missing inserver/ratelimit.tsserver/ratelimit.test.tsstringtype annotation inserver/ratelimit.test.tsserver/rpc-guards.test.tsstreamResponsehelper not hoisted insrc/hooks/useChat.test.ts'calling'statustoolCalls[0].namescreen.getByText().closest('button')!pattern insrc/components/EmptyState.test.tsxwould read better asgetByRole('button', { name: ... })vi.clearAllMocksis a no-op insrc/components/EmptyState.test.tsx(no mocks to clear)||vs??insrc/components/ChatPanel.tsx:25(semantically fine, stylistically??is preferable)EmptyStaterepresentative-query strings duplicated between code (EmptyState.tsx:55-93) and tests (EmptyState.test.tsx)Why a single umbrella
4.1+4.2a+4.2b+4.3)qa-2026-04-26baseline cleanup ([QA-2026-04-26] Track all 27 remaining findings from baseline QA run #3 → 27 children, all closed)Plan
Single P3 cleanup PR post-bounty (after 2026-05-12). Could be batched into a quarterly tech-debt sprint or split into product-code (3 items) + test-quality (9 items) + process (1 item) sub-clusters if the volume justifies it.
Cross-references
Priority
P3 — bookkeeping / quality polish. Bounty deadline 2026-05-12 takes precedence.