Skip to content

I18n update

I18n update #22

Triggered via push January 31, 2026 11:58
Status Failure
Total duration 51m 32s
Artifacts

ant.yml

on: push
check-release-needed
5s
check-release-needed
Matrix: call-workflow
Fit to window
Zoom out
Zoom in

Annotations

4 errors
call-workflow / plugin-build
Error: The process '/opt/hostedtoolcache/apache-ant/1.10.15/x64/bin/ant' failed with exit code 1
call-workflow (r19044) / plugin-build
The strategy configuration was canceled because "call-workflow.job" failed
call-workflow (r19044) / plugin-build
The operation was canceled.
Java CI
The strategy configuration was canceled because "call-workflow.job" failed